Calculation of Textile Loom Production and Efficiency

Textile Weaving Loom Production and Efficiency Calculation

loom-production-calculation-formula

loom production calculation formula

 

Loom Machine Rpm = 900
Picks per inch = 80
Time to mend warp breakages= 05 minutes

Weft breakages time = 4 minutes

Other stops = 08 minutes

Total stoppage time = 05+04+08 = 17 minutes

Total hours of working shift = 8 hrs.
Real time utility = 7 hrs. and 43 mins = 7.716 hrs.

 

Loom Efficiency(%)=

real time utility ( hrs) X 100
total hours of working shift

                                 = 7.716 x 100 / ( 8)

                                  = 96.45 %

Loom Production= Rpm x 60 x total working hours of shift x Efficiency
Picks per Inch x 39.37 X 100

                       = 900 x 60 x 8 x 96.45 / ( 80 x 39.97 x 100)

                       =132.29 Meter

 