Textile Weaving Loom Production and Efficiency Calculation

loom production calculation formula
Loom Machine Rpm = 900
Picks per inch = 80
Time to mend warp breakages= 05 minutes
Weft breakages time = 4 minutes
Other stops = 08 minutes
Total stoppage time = 05+04+08 = 17 minutes
Total hours of working shift = 8 hrs.
Real time utility = 7 hrs. and 43 mins = 7.716 hrs.
Loom Efficiency(%)= |
real time utility ( hrs) X 100 |
total hours of working shift |
= 7.716 x 100 / ( 8)
= 96.45 %
Loom Production= | Rpm x 60 x total working hours of shift x Efficiency |
Picks per Inch x 39.37 X 100 |
= 900 x 60 x 8 x 96.45 / ( 80 x 39.97 x 100)
=132.29 Meter